Photos taken by LSI Systems (M) Sdn Bhd (Facade lighting contractor). The LED lighting equipment installed and configured based on facade lighting design by Lightwave Sdn Bhd for 4G9 Tower create colourful and exciting effects on the fibonacci facade.
PROGRESSIVE ARCHITECTURAL SOLUTIONS FOR THE NEW MILLENNIUM
Showing posts with label Putrajaya. Show all posts
Showing posts with label Putrajaya. Show all posts
Wednesday, August 31, 2011
4G9 Tower: Progress as at 17/8/2011. Temporary Certificate of Fitness for Occupation (TCF)
Office tower for The Ministry of Information, Communications and Culture is nearing full completion with rectification works in progress. The handing over process is currently underway towards full occupancy by the aforesaid ministry. Application for the final Certificate of Fitness for Occupation (full CFO) is being made upon having complied with inspection comments.
Tuesday, August 2, 2011
4G9 Tower: Facade Lighting
Photographs taken by the lighting designer Lightwave Sdn. Bhd. shows the cascading effect of LCD equipment on the Fibonacci facade.
Monday, August 1, 2011
4G9 Tower: Progress as at 30th June 2011



Photographs taken by the project Resident Architect shows progress as at 30th June 2011, achieved completion of the facade works with interior works still on going. As of to date, application for Certificate of Fitness for Occupation has been submitted to Perbadanan Putrajaya for approval, before the building is handed over to the Ministry of Information, Malaysia.Monday, March 21, 2011
4G9 Tower: Progress as at 21/3/2011
View from across Dataran Gemilang.


Close up of the roof enclosure.
View from Precinct 19, Putrajaya.
Photographs showing construction progress as at 21/3/2011. Derrick cranes at roof level have been dismantled to enable work on remaining sections of the roof skylight structure to proceed towards completion. Painting works on exterior walls are in progress with final coat yet to be applied. Interior finishes are being installed at ground floor main reception lobby and at lower ground floor multi purpose hall. External works are in progress.
Thursday, March 17, 2011
Facade lighting for 5G2 Government Buildings
Labels:
5G2 Building,
Architecture,
Projects,
Putrajaya
Wednesday, February 16, 2011
4G9 Tower: Progress as at 16/2/2011

Friday, January 21, 2011
Tuesday, December 28, 2010
Parcel F9 and F10, Putrajaya.




Final design scheme for parcel F9 and F10 jointly developed with S&O Architects (F11), submitted to Perbadanan Putrajaya for planning permission, and proceeding with preparation of tender drawings. The design was developed based on concepts initiated by the lead architects, Pakatan Reka Architects Sdn Bhd (PRA).
Saturday, November 13, 2010
4G9 Tower: Progress as at 9/11/2010
Regular monthly progress photographs. Fibonacci facade installation completed. Main contractor proceeding with skylight structure installation and spray painting works.One of two tower cranes dismantled. At this rate, the building enclosure could be completed by end of the year but external works and interior works are still in progress. Taking into consideration the process for application of CFO, completion date is targetted mid 2011.