Photos taken by LSI Systems (M) Sdn Bhd (Facade lighting contractor). The LED lighting equipment installed and configured based on facade lighting design by Lightwave Sdn Bhd for 4G9 Tower create colourful and exciting effects on the fibonacci facade.
PROGRESSIVE ARCHITECTURAL SOLUTIONS FOR THE NEW MILLENNIUM
Showing posts with label 4G9 Tower. Show all posts
Showing posts with label 4G9 Tower. Show all posts
Wednesday, August 31, 2011
4G9 Tower: Progress as at 17/8/2011. Temporary Certificate of Fitness for Occupation (TCF)
Office tower for The Ministry of Information, Communications and Culture is nearing full completion with rectification works in progress. The handing over process is currently underway towards full occupancy by the aforesaid ministry. Application for the final Certificate of Fitness for Occupation (full CFO) is being made upon having complied with inspection comments.
Tuesday, August 2, 2011
4G9 Tower: Facade Lighting
Photographs taken by the lighting designer Lightwave Sdn. Bhd. shows the cascading effect of LCD equipment on the Fibonacci facade.
Monday, August 1, 2011
4G9 Tower: Progress as at 30th June 2011



Photographs taken by the project Resident Architect shows progress as at 30th June 2011, achieved completion of the facade works with interior works still on going. As of to date, application for Certificate of Fitness for Occupation has been submitted to Perbadanan Putrajaya for approval, before the building is handed over to the Ministry of Information, Malaysia.Monday, March 21, 2011
4G9 Tower: Progress as at 21/3/2011
View from across Dataran Gemilang.


Close up of the roof enclosure.
View from Precinct 19, Putrajaya.
Photographs showing construction progress as at 21/3/2011. Derrick cranes at roof level have been dismantled to enable work on remaining sections of the roof skylight structure to proceed towards completion. Painting works on exterior walls are in progress with final coat yet to be applied. Interior finishes are being installed at ground floor main reception lobby and at lower ground floor multi purpose hall. External works are in progress.
Thursday, March 17, 2011
CV: Featured Projects


Featured on these pages are projects which, in our opinion, truly represent the firms' values and capabilities. For details, please look up the preceeding posts within this blog.Putrajaya Lot 4G2
Putrajaya Lot 4G9
Putrajaya School Complex, Precinct 11
Putrajaya Parcel F (Competition scheme)
Putrajaya Parcel F (Final Scheme)
Putrajaya Waterfront Office Competition Proposal
Kelab Sultan Suleiman, Kuala Lumpur
Putrajaya Lot 5G2 (SeniBahri Arkitek)
MITI HQ Competition Proposal,
Kuala Lumpur
UiTM Resort, Block 10 Refurbishment,
Shah Alam
Visitors’ Centre at Mutiara Damansara
Projects for Boustead Holdings Berhad
Commercial Building on Lot 2C2, Putrajaya
Commercial Development Proposal for Felcra Berhad
Commercial Development Proposal on Lot 3C10 and 3C11 Putrajaya
CV: Putrajaya Lot 4G9

4G9 Tower (abbreviation for Precinct 4, Government Building, Parcel 9) designed for The Ministry of Information, Malaysia, is located on a strip of crescent shaped development site facing the Dataran Gemilang, a circular landscaped open space situated at the southernmost tip of the Core Island, Putrajaya. In the urban context, this 39 storey office building is part of a group of 4 towers earmarked to become the tallest structures to be built within the Core Island development.
In November 2003 a competition was organized by Putrajaya Holdings Sdn Bhd in which 10 Malaysian architectural firms were invited to participate. 3 firms obtained the commission for lots 4G9, 4G10 and 4G11; Jafri Merican Architect, Aqidea Architects and Hijjas Kasturi and Associates Sdn, respectively. The commission for Lot 4G8 was awarded to Juhari & Hashim Chartered Architects based on an earlier competition. Lot 4G9 was tendered as a design and build contract and was awarded to WCT Berhad. Completion date is targeted in late 2010.
The visual metaphor for the tower is based on traditional Malay artifacts and crafts, the curved side elevations recalling the shapes of ancient stone artifacts, and the diagonal shaped central façade pattern symbolizing a traditional form of textile craft, the ’songket’.
In order to translate these metaphors into buildable forms of specific measurable dimensions, a concept based on the Fibonacci Series is conceived as a form-giver to be used for shaping the tower. The series is a mathematical progression of numbers where the following number is the sum of two previous numbers; 1,1,2,3,5,8,13…. From this concept, a series of segmented façade surfaces is formed beginning from the roof, 1 storey, 1 storey, 2 storey, 3 and so forth to 13 storey for the lowest façade surface. These surfaces, formed of diagonal elements are then set in at different planes, and detailed by façade engineering consultants based on the unitized curtain wall concept. The sides of the tower, designed of precast RC fins with punctuated windows, serve as a counterpoint to the visually lighter Fibonacci façade.
The 4G9 tower building enclosure utilizes passive solar shading devices to achieve an Overall Thermal Transmission Value of lower than 45 w/m2.
Wednesday, February 16, 2011
4G9 Tower: Progress as at 16/2/2011

Friday, January 21, 2011
Tuesday, December 28, 2010
Friday, October 8, 2010
4G9 Tower: Progress as at 5/10/2010
The fibonacci facade has by now progressed 5 floors since 6/9/2010. At this rate, completion of all facade works can be anticipated by end of December 2010. With fibonacci 3 segments being installed, the geometrical progression has become more apparent in the facade. WCT and Avos had done a commendable job in fabricating the facade, and we hope to see fibonacci 2 segment at levels 36 and 37, the highest two office floors, to be completed by next month, leaving the skylight structure of fibonacci 1+1 at the mechanical levels to be installed come December 2010.
Labels:
4G9 Tower,
Architecture,
Projects,
Putrajaya
Tuesday, September 7, 2010
4G9 Tower: Progress as at 6/9/2010
Labels:
4G9 Tower,
Construction,
Projects,
Putrajaya