PROGRESSIVE ARCHITECTURAL SOLUTIONS FOR THE NEW MILLENNIUM
Friday, August 27, 2010
Mutiara Damansara shophouses and shopoffices
Tuesday, August 17, 2010
Wisma Tani 4G2 hand drawn elevations during design stage


During the design stage of this project I discovered it to be necessary at that point in time to prepare some hand drawn elevation drawings overlaid upon computer drawn lines of floor height and structural grid. This is an important process for establishing visual dimensions of cladding lines required by the architect as easy reference for CAD draughtsmen to follow.This process eliminates abortive comments and multiple corrections of CAD working drawing. By the time the draughtsman had keyed in the information it was already 90% correct.
Corner treatment, visual accents and other architectural requirements are added in at this stage. It is part of the design decision making process.
Labels:
Projects,
Putrajaya,
Sketches,
Wisma Tani 4G2
Monday, August 16, 2010
UiTM Resort Block 10 refurbishment, Shah Alam



The UiTM Resort in Section 6, Shah Alam was built as a private low rise condominium development in the early 80’s. Upon its purchase by UiTM, the entire development was converted into an accommodation facility, catering mainly for post graduate and foreign students. Complemented by supporting facilities consisting of a coffeehouse, restaurants, meeting rooms, a banquet hall, tennis courts and various service facilities; all buildings within this complex had been built on an undulating site and linked by landscaped covered walk paths for accessibility within a reasonable walking distance from one block to another.In 2005 the UiTM Vice-Chancellor initiated efforts to upgrade and improve the condition of the accommodation blocks, which by then had become dilapidated, and to create a theme and image that is more suitable for a resort, rather than the existing outlook of a low rise condominium. Jafri Merican Architect was appointed to explore suitable concepts and to prepare tender drawings for design and build contracts. A number of optional concepts were explored and finally, UiTM agreed on a Mediterranean theme for the resort. In mid 2007, the client gave the go ahead for tender exercise for Block 10. Jafri Merican Architect was novated for appointment under the design and build contractor to work with their consultant team and produce working drawings for construction. Construction works were completed in early 2008 but practical completion was delayed until mid 2008 due to interior design changes. The completed Block 10 was made operational for the January 2009 intake of foreign students.
Sunday, August 15, 2010
Rimba Nilai Restaurant




Designed for my golfing buddy Dato' Dr. Fahmi Karim, this restaurant located in Nilai not far from the old (now closed) toll gate, is planned to cater for 300 patrons. The design is based on a Malay theme with clay roof tiles, stone walls and its related motifs. The site is visually strategic atop a small hill, is accessible from an adjacent housing scheme, and the site planning divides the land into several terraced levels. The dining areas are split into two separate structures by a water feature which is hoped to imbue the scheme with a certain softness and connection with nature, the setting being amidst landscaped greenery and surrounding rubber estate also owned by the client. This proposal was prepared as hand drawn illustrations by my associate Saiful Bahri Sulaiman.TNB Regional Headquarters, Kangar, Perlis

The regional headquarters for Tenaga Nasional Berhad in Kangar, Perlis was our first office building project. Designed in 1998, the project was completed in 2000 and by request from the client, the concept was based on a pitched roof structure. To avoid the domestic look normally associated with pitched roofs, we opted for slate roof tiles to give the scheme a more corporate outlook. In addition, to give the building a simpler, more rounded form, the staggered roof design was merged into one another in a continuous slope. The external colour scheme is a combination of white and light bluish grey to match the roof tiles and give this building a subdued subtle outlook suitable for an office.
Saturday, August 14, 2010
Miti Headquarters: Competition scheme
Perspective view from west
View of sloping courtyard
West elevation
North elevation
Aerial viewIn November 2008, Putrajaya Holdings Sdn Bhd invited 8 Malaysian architectural firms to participate in a competition for The Ministry of Trade and Industry, Malaysia headquarters building in Jalan Duta, adjacent to the Matrade Building. 3 proposals, those by Veritas Architects Sdn Bhd, RSP Architects Sdn Bhd. and Jafri Merican Architect were presented to the minister for his selection.
Our strategy to achieve both efficiency and slenderness was to design the tower block in 3 separate elements and have these interlock in one composition. One of these elements, the service core with a vertical glass enclosure comprising a stairway and a bank of bubble lifts, allow visitors views towards Kuala Lumpur while giving the tower its vertical outlook. The other 2 interlocking elements of the tower composition, a sloping rectangle and a curved glass form, featured a roof deck accessible from a dining/meeting room that could be used for entertaining visiting dignitaries. The tower skyline is embellished with a shaded glass dome housing a conference room; and a pinnacle in the form of a telecommunications tower above the service core.
The entire complex was planned based on a C-shaped configuration with entrance lobbies for VIPs being separated from the public entrance (accessing the multi purpose hall and an auditorium 6 metres below the main road level). The level difference within this site was addressed by a gently sloping central courtyard which allow visitors access to different zones within the proposed development; and a circular garden of tropical forest trees linked to a free form landscaped garden with walkpaths leading to an open air ampitheatre. Every conceptual decision made for the scheme reflected our intention to create an architectural proposal that was designed to cater to the specific needs of The Ministry of Trade and Industry, Malaysia both in terms of functionality and corporate image.
Single storey bungalows and zero lot bungalows for Peraga Properties Sdn. Bhd.
The site plan
The zero lot single storey bungalow
The single storey bungalow
The zero lot bungalow floor plan
The single storey bungalow planThis development consisting of 5 units of single storey bungalows and 6 units of zero lot bungalows are currently undergoing construction in Pinggiran Kemuning, near Kota Kemuning. For more information regarding available units please contact Peraga Properties Sdn. Bhd at 03-51922660.
Precinct 14 Primary School, Putrajaya





This primary school project in Precinct 14 Putrajaya was developed to tender documents stage before it was put on KIV in 2004 due to budget cutbacks during the Abdullah Badawi administration. The design was based on concepts explored during the design of the Precinct 11 school complex, utilizing multiple courtyards, sunshading devices, wide overhanging roof eaves, exposed brick facades and a predominantly tropical architectural character. This project was commisioned to Jafri Merican Architect as the outcome of a competition participated by several architectural firms, organised by the client, Perbadanan Putrajaya sometime in mid 2003.
Carey Island Marina



This proposed development project was presented by Prima Muda Sdn. Bhd. (Tan Sri Ramli Kushairi, Executive Chairman) to Golden Hope Berhad in 2005 before their merger with Sime Darby Berhad. The scheme covers an area of approximately 500 acres and consists of a small township, a marina, public amenities and a golf course.
Parcel F8 Green Building: Preliminary design development drawings



Parcel F8 in Putrajaya is a multipurpose, common facilities building for the Parcel F Development adjacent to the present Parcel E development and Alamanda. In the preliminary scheme our concept featured a pedestrian ramp connecting the different levels on which are located the Surau, auditorium, multipurpose hall, cafetaria and visitors' centre. The architectural features comprise checkered screen patterned sunshading devices for energy saving and to imbue the scheme with character based on a modern interpretation of tropical architecture.
Tuesday, August 10, 2010
4G9 Tower: Progress as at 10/8/2010
Labels:
4G9 Tower,
Construction,
Projects,
Putrajaya